Browse all practice questions for the NCCER Turner Recertification Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

NCCER Turner Recertification Practice Exam course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • What should workers do if they see a personnel platform exceeding its recommended load?
  • Who is responsible for reporting crane accidents to OSHA?
  • What is the required fire extinguisher rating according to ASME B30.5 for cranes?
  • What is the purpose of lifting lugs in boom sections?
  • Dated records of inspections must be made and kept by the platform user for the duration of what operation?
  • During a crane operation near power lines, what should be done with non-essential personnel?
  • After any structure repair or modification, what percentage should the platform be tested to?
  • Why is it important to know the load position from the tipping axis?
  • Who must the crane operator be in constant contact with during crane operation near energized power lines?
  • What must be done if the boom extension is offset when removing intermediate boom sections?
  • What needs to be deducted from the gross capacity of a crane when considering the load block, headache ball, and wire rope?
  • During freezing weather, what should be frequently checked for water accumulation?
  • How is the final offset for the A-frame jib adjusted?
  • Cranes and derricks with variable-angle booms must be equipped with what essential indicator?
  • When performing a load test on a vacuum lifter, what percentage of the rated maximum load of the system should not be exceeded unless recommended otherwise?
  • If the crane operator encounters a situation where the boom is damaged, what is the immediate action to take?
  • What is essential for ensuring safe critical lift operations?
  • What factor greatly influences the stability of a crane during operation?
  • What does the percentage of voltage decrease around a crane after it strikes a power line depend on?
  • What is the primary function of additional counterweights on a crane?
  • Can any intermediate boom extension be assembled to the boom head?
  • Cranes are typically designed to be?
  • What do the load/capacity charts of mobile cranes depend on?
  • What is the minimum height for a toeboard on the guardline as per ASME B30.23?
  • Which item is essential for ensuring the correct operation of a hoist?
  • What is a common safety concern with cranes during operation?
  • What is the term for the bright light formed when a strong current jumps a gap in a circuit or between electrodes?
  • Does the length of a boom include the length of the jib?
  • According to ASME B30.23, to what percentage should the platform and rigging be proof tested?
  • A rough surface finish on ferrous material will have what effect on the lifting capacity of a magnet?
  • What type of fire extinguisher is required to be mounted in or around the cab of a mobile crane according to consensus standards?
  • The effectiveness of a magnet increases with what factor?
  • What type of brakes do dynamic compactors use for the hoist drum?
  • What is a replaceable steel tube mounted in a case or housing called?
  • Is interpolation allowed in determining load capacities?
  • What can be inferred about the operation of cranes without proper training?
  • What happens if counterweights are not used correctly in crane operations?
  • What is a document that outlines all weight, rigging, and configuration requirements for a lift called?
  • What is the most important consideration in loading and unloading a mobile crane?
  • What must be ensured regarding the suspension ropes during boom assembly?
  • If crane contacts power lines and there is no danger of fire, what should the operator do?
  • What component must be reviewed to ensure the safe transport of heavy equipment?
  • What is the common usage of a load operating radius?
  • Under what circumstance must a crane accident be reported to OSHA within 8 hours?
  • When determining the boom length for a lift, what factor should be the shortest length?
  • What is an important consideration when handling a boom to avoid operational issues?
  • How is the weight of components like the jib considered during lifts?
  • What are different boom configurations that can be activated and deactivated by a switch called?
  • What factor is critical while determining the effective lifting capacity of a crane with extensions?
  • What should the operator do if the boom, mast, or gantry is struck or damaged?
  • What is recommended before performing a critical lift?
  • When is the boom point evaluation most critical?
  • For voltages over 50 kV, how much does the minimum required high-voltage power line clearance increase for every 150 kV?
  • Which of the following is NOT a requirement for a personnel platform during operations?
  • What might be necessary to lift a longer boom off the ground?
  • What should be done after the boom parts are unloaded?
  • What must be done to crane capacities for lower tire inflation pressure?
  • Who is typically responsible for ensuring compliance with safety regulations during a lift?
  • For on-rubber lifting, capacities should not exceed what percentage of tipping?
  • Which of the following practices is essential for safe crane operation?
  • What diagram identifies the minimum allowable clearances between the load blocks and boom tip?
  • Which factor is NOT a consideration when planning crane placement?
  • What type of lifter is commonly used to lift loads with a suitable surface for vacuum lifting pads?
  • How can the amount of counterweight needed to lift the boom be verified?
  • What is the maximum height allowed for a top rail on a personnel platform?
  • What serves as the first pivot point when attaching the swing-away extension to the boom?
  • What should be the primary focus when unloading a mobile crane to ensure safety?
  • In lift planning, what does it mean to classify a lift as "critical"?
  • What is true about measuring the longest load radius during a multiple crane lift?
  • What is defined as the load weight multiplied by the horizontal distance from the load's center of gravity to the tipping axis?
  • By what method should boom sections be lifted?
  • Which section of the boom is powered to extend or retract the fly in a power-pinned fly covered setup?
  • What is a key consideration when operating a crane near power lines?
  • Where can boom assembly, boom gantry, and back hitch assemblies be found?
  • What must occur before crane operations take place near energized power lines?
  • What is the first step in stowing the swing-away extension?
  • Why is it important to consider lifting techniques prior to an operation?
  • What is a swing-away lattice extension commonly referred to as?
  • What should the operator do if the boom hoist cable appears frayed?
  • Who provides the optimal configuration for loading a crane for transport?
  • Why is it important for operators to understand crane leverage?
  • A small cord or rope used for securing or suspending is referred to as a what?
  • Which type of crane can be truck mounted or crawler mounted?
  • What factors need to be considered as part of the lift plan for wire rope?
  • Controlled load lowering is defined as lowering that is regulated by which type of system?
  • Before booming down, what component must undergo a thorough inspection?
  • What generally influences the need for critical lift classification?
  • What must be extended before adjusting counterweights on a carrier-mounted crane?
  • What equipment is used to connect the lanyard to a stable anchor?
  • What is the primary purpose of using a boom identification number?
  • What should the crane operator be aware of during a lift operation?
  • What is the term for a crane's ability to resist tipping?
  • Which factor is not a concern when selecting a location for crane assembly?
  • Welds on the suspension system of cranes must comply with which standard?
  • What is the primary function of a boom angle indicator on cranes or derricks?
  • What can cause a crane to tip over or fail structurally?
  • What type of crane is a common choice for projects requiring versatility on various terrains?
  • Rough-terrain cranes are designed to be operated within what percentage of being level?
  • Which type of metal can be lifted with an electromagnet?
  • What method is used to relieve tension on the rear jib support cables when stowing the A-frame jib?
  • What is the first concern for crane assembly?
  • What demolition method is most advisable for demolishing low-level objects?
  • What type of cranes are designed to travel at highway speeds from job sites?
  • Before performing booming operations, what should be inspected thoroughly?
  • What factor does a lever-type binder multiply stored energy by?
  • What determines the position of the heaviest crane during a multiple crane lift?
  • What is required if a crane manufacturer produces only one model but each unit has a different serial number?
  • What formula is used to determine a crane's leverage?
  • When assessing a crane's lift capacity, what must be measured alongside the crane weight?
  • What should the boom sections be inspected for prior to assembly?
  • Why must cranes be assembled on-site?
  • Which factor is crucial to avoid in crane operations?
  • Which device is specifically used for lifting ferrous metals?
  • Which procedure is done before the boom is secured during assembly?
  • Which of the following is a requirement for a personnel platform's design?
  • What is the correct action to take if power line contact occurs while operating a crane?
  • To prevent backward collapse of a crane after two-blocking, should the operator pull continually on the hoist line?
  • According to ASMS standards, when must crane refueling be performed?
  • Where is the least capacity of a typical truck-mounted crane without a forward outrigger observed?
  • In the context of crane operation, what does "rigging" refer to?
  • What is the first step before adding or removing counterweights?
  • How are multiple crane lifts categorized regarding their planning?
  • What device warns crane operators of electrical hazards?
  • After any structural repair or modification during proof testing, the platform must be tested at what percentage of its rating?
  • What safety equipment should be available to the crane operator within the cab?
  • When lifting from the main boom, which crane feature is considered in weight calculations?
  • In a critical lift, where must the crane hook be positioned?
  • What is the leading cause of mobile crane accidents?
  • Do crane manufacturers produce a separate load/capacity chart for each operational quadrant?
  • A personnel platform and suspension system is also known as what?
  • Lifelines used in areas where they may be subjected to cutting or abrasion must be a minimum of what size in rope?
  • Where can guidelines for installing various boom attachments typically be found?
  • What is the recommended approach during a critical lift operation?
  • What is the primary purpose of fall protection equipment in hoisting personnel operations?
  • Can any pins and fasteners be used for boom assembly as long as they are secured by cotter pins?
  • If the boom length is between values listed on the load chart, which capacity should the operator use?
  • The minimum clearance distance between hand railings and other structures is intended to prevent what?
  • What type of rigging must assembly and disassembly personnel use when assembling boom extensions?
  • Which of the following is required for safely assembling a mobile crane?
  • Which of the following describes the condition of a crane's load when the boom length is at its maximum?
  • What action should be taken when a crane reaches its load capacity?
  • Who is responsible for classifying each lift into categories such as ordinary, critical, or pre-engineered production?
  • How is boom whip eliminated in dynamic compactors?
  • According to regulations, what is prohibited regarding the use of cranes to hoist employees on a suspended personnel platform?
  • Where can personnel find information on installing various boom attachments on a crane?
  • What is a rope or bar of specified length with fixed end connections referred to as?
  • For each crane, where are guidelines and instructions for installing various boom attachments and components found?
  • What does the crane's leverage depend on primarily?
  • What is the function of the guard rail on a personnel platform?
  • What does the load/capacity chart bear that is essential for identifying its relevance to a crane?
  • Pendants may come in matched sets of how many?
  • A frame jib consists of what components?
  • According to OSHA, what must access gates be equipped with?
  • What is the maximum load allowed on a single axle?
  • What must the crane assembly area be?
  • Is it true or false that the personnel platform shall not be loaded in excess of its rated capacity?
  • What is a characteristic feature of lattice boom cranes?
  • What is the importance of reeving the hoist rope correctly?
  • What must be permanently marked on a personnel platform?
  • Under which standard are fall protection equipment and guidelines for hoisting personnel covered?
  • What is the minimum clearance that should be maintained from power lines that are 0-50kv?
  • After rigging the main hoist line during boom assembly, what must the operator check for proper installation?
  • What happens if the crane's leverage is not greater than the load's average leverage?
  • What is the recommended limit for capacities when a crane is on rubber?
  • To what weight do regulations under Section 393.130 apply?
  • What type of rope is recommended for lifelines exposed to cutting or abrasion?
  • A full body harness lanyard must be a minimum of what size in rope or equivalent?
  • What safety feature must a personnel platform have besides a guard rail?
  • How is a crane's leverage determined?
  • What must you pass in order to drive a commercial vehicle?
  • What type of diagram illustrates a crane's full range of boom lengths, jibs, and boom extensions?
  • For vertical surface lifts, a vacuum lifter's rated load must not exceed what percentage of the ultimate pad capacity?
  • When dealing with suspension ropes and pendants, what is important to ensure?
  • What must the operator check before operating the crane?
  • What is always required for critical lifts?
  • What is the recommended way to check the load capacity of a crane?
  • Which of the following statements is true regarding boom assembly?
  • What type of chart does a crane manufacturer design for each crane model?
  • The load/capacity chart for a crane can be specific to which of the following?
  • What is identified as a major cause of over half of mobile crane accidents?
  • In crane operation, what does a reduced tire pressure indicate about load capacity?
  • What position must the block be in when raising the boom?
  • Why is it important for the boom to be correctly assembled before attaching the jib?
  • What is the purpose of the range diagram in crane operations?
  • If a lattice boom touches or rests on a structure, how do the loading conditions change?
  • A tipping axis in crane operations is important for what reason?
  • What should be done to prevent mixing different types of boom sections?
  • According to safety practices, how should you move away from a crane once on the ground?
  • What happens to the loading when a lattice boom comes into contact with another surface?
  • When using an equalizer beam, the load radius for each crane is measured to which point?
  • What is the recommended action if damage is found on boom parts?
  • What is the sole responsibility of a qualified signal person during crane operations?
  • Which precaution should always be taken before moving counterweights?
  • When the crane is configured over-the-side, what is the effect on the center of gravity?
  • What is the unofficial zone where limited crane operations can be performed if absolutely necessary?
  • Which type of sheave is employed to equalize tension in opposite parts of the rope?
  • On lattice boom cranes, what is measured from the center line of the boom to the horizontal?
  • What role do turnbuckles play in construction equipment assembly?
  • Why must most cranes be disassembled for transport?
  • What is the term used for a frame that supports a boom and is hinged at or near the boom hinge?
  • What does the prohibited zone refer to in crane operation?
  • What factor is crucial for determining the effectiveness of load lines in cranes?
  • What is the term for a rope used to control a deep onion ball during in-line or slewing demolition?
  • What term describes an object's position relative to the horizontal?
  • What is the method of confirming the crane's readiness before initiating operations?
  • Jib charts are used to show the capacities of the jib at what aspect?
  • During critical lift operations, what must the operator obey at all times?
  • Before beginning a lift, what should be verified regarding the boom and load?
  • Where can information on boom assembly and related components be found?
  • Which aspect is vital for the effectiveness of dynamic compactors?
  • Are multiple-crane lifts considered as critical lifts?
  • Platforms that have been out of service for 12 or more consecutive months must receive which type of inspection prior to use?
  • What proportion of range accidents is caused by assembly errors?
  • What effect does loading a crane with the boom as low as possible have?
  • What is a major cause of over half of all mobile crane accidents?
  • What should be the first step if a crane begins to tilt during operation?
  • Ratchet type binders are multiplied by what factor according to safety standards?
  • What type of protective equipment should be worn when operating a crane?
  • What is the limit regarding the number of employees occupying a platform?
  • What is essential to do before lifting with a crane?
  • When boom sections are stacked on a trailer, what must be placed between them?
  • What is the main purpose of a lift plan?
  • What type of criteria do the type of hitch and the number of shackles fall under?
  • What is the minimum number of tiedowns required to restrain heavy equipment or machinery?
  • Where can guidelines for assembling the crane and installing boom components be found?
  • What is forbidden to transport while still attached to a crane?
  • When should electrical connections be established during the attachment of the swing-away extension?
  • How should all pins be secured during crane operation?
  • The weight of the load block is considered part of which of the following?
  • Which of the following is essential to know when calculating load weight on a crane?
  • What is essential for communication between the crane operator and assemblers?
  • What does the term 'jib' refer to in crane terminology?
  • What category must a designated person classify a lift into before planning?
  • Which type of crane is not permitted for hoisting personnel?
  • Which standard provides guidance for determining the structural strength of cranes?
  • In a multiple crane lift, the crane with the greatest net capacity should be positioned where?
  • Lift plans are mandatory for which type of operations?
  • How are both ends of each pendant typically identified?
  • How is a lift classified when the load is not visible to the operator?
  • Which component is critical when establishing the load rating of a crane?
  • Which load factor is essential for safely binding heavy objects using a lever-type binder?
  • The foundation and location of electrical hazards are examples of what type of information?
  • What factors may limit the capacities on a load/capacity chart?
  • What is defined as the maximum horizontal distance from the axis of rotation to the center of the vertical hoist line with load applied?
  • What should suspension ropes and pendants be maintained with to ensure they are in good condition?
  • In crane operations, what does the term 'live booms' refer to?
  • In a multiple crane lift using an equalizer, is the weight of the equalizer considered part of the total load weight?
  • When lifting from the main boom with the jib extension, what must be done with the effective jib weight?
  • A personnel platform must support its own weight and at least how many times the maximum intended load?
  • What is a critical safety consideration before operating a crane?
  • What is indicated if the fittings on boom sections are bent?
  • Which authority regulates the transportation of cranes?
  • Why might the boom move back against the boom stops when a load is released at a high boom angle?
  • When jumping off a crane that has hit a power line, how should you keep your feet?
  • In crane operation, maintaining a level surface primarily ensures what?
  • Suspended weight does not include which of the following?
  • The shifting of the center of gravity in a crane can affect which of the following?
  • What is the limit for capacities on outriggers?
  • True or False: A straight truck-trailer combination that exceeds 65 ft may not be driven on public highways without a special permit.
  • What should be avoided during critical lift operations?
  • How can a crane be affected before any signs of tipping appear?
  • As a crane swings to various quadrants, how does the load's position from the tipping axis change?
  • Which safety measure is critical to prevent boom damage during operation?
  • What is the first consideration for crane assembly?
  • What method is advisable in demolition operations to break an object?
  • What is essential to ensure safety during multi-crane operations?
  • While in transit with no load and the boom or mast lowered, what is the minimum required clearance for voltage between 50 and 345 kV?
  • To determine the parts of line, an operator must do what?
  • Where is the proper place for securing a lanyard?
  • What components are used to assemble the A-frame jib to the swing-away extension?
  • For lines rated 50 KV or below, what is the minimum clearance required between the lines and any part of a crane load?
  • Which crane type is typically less maneuverable due to its size?
  • How can an equalizer beam affect crane operation during lifting?
  • What information must be kept in the crane cable at all times?
  • Which action is indicative of proper safety protocol during crane operations?
  • What is the primary purpose of an equalizer beam during a lift?
  • What does the term “rated load capacity” refer to for a personnel platform?
  • For personnel platforms, load lines should support how many times the intended load weight?
  • Load lines must support at least how many times the maximum intended load without failure?
  • For cranes designed for travel on public roads, they must comply with what regulations?
  • What type of cranes have hydraulic counterparts?
  • What is the single largest cause of fatalities associated with cranes?
  • What should be checked for on boom sections?
  • Which element is critical for the safety of boom operations?
  • When should the hoist brake be applied during vertical-drop balling?
  • In order for a crane to make a lift, the crane's leverage must be greater than which of the following?
  • What should you lock when performing work on counterweights or during boom assembly?
  • What component provides extra stability to the crane during lifting operations?
  • According to OSHA 1926.550(G), which requirement applies when working near or over water?
  • How tall must the top rail on a personnel platform be in relation to the platform floor?
  • What is a metal composed of two or more metals known as?
  • Site preparation and crane erection typically take the most time for which type of cranes?
  • At what point in the jib assembly procedure is the jib attached to the lattice boom tip?
  • How are personnel lifts categorized in terms of safety?
  • What type of lift requires detailed calculations and planning due to potential hazards?
  • The lower barrier of the guardrail on a personnel platform is situated between which two components?
  • Which of the following is a consideration for crane placement?
  • What is the property of a fluid that resists the force tending to cause it to flow?
  • What is the condition called when there is a dropping or sagging of the load when lifting with a magnet?
  • Which crane element is included in the effective weight calculation past the main boom lifting points?
  • Where must a grab rail be installed on a personnel platform?
  • During assembly, what condition of the boom sections might lead to improper fitting?
  • What is a potential consequence of operating a crane beyond its limitations?
  • During the assembly of long lattice booms, what is the maximum limitation on each group raised?
  • Why are proper counterweights essential in boom assembly?
  • Which device should be engaged when performing work on the counterweights?
  • What is critical to prevent accidents during crane assembly?
  • What risk can occur with a crane before any signs of tipping are evident?
  • What should an operator ensure before lifting a load with a crane?
  • When lifting materials with a magnet, what is the recommended first step for the operator?
  • What needs to be removed before laying the hoist rope for the axillary single-sheave boom head?
  • When connecting boom sections, which part should be secured first?
  • To ensure safety, what kind of blocking should be used between stacked crane boom sections?
  • According to OSHA, each bridle-sling leg must be connected to what to ensure proper load distribution?
  • Where should barricades be placed when assembling a crane?
  • What must be secured first when connecting boom sections?
  • What is referred to as the distance from the ground to the center of the boom point sheaves?
  • What is the proper way to handle the boom to prevent damage?
  • In multiple crane lifts, what is the maximum loading capacity for each crane?
  • Disassembly of most lattice boom cranes involves the removal of what components?
  • What applies to your truck and trailer combination while traveling on the Interstate Highway System?
  • What is the preferred condition for crane operation near power lines?
  • According to ASME B30.5, what must a load rating chart include?